Soekarno-Hatta International Airport
Encyclopedia
|
| Tutorials | Encyclopedia | Dictionary | Directory |
|
Soekarno-Hatta International Airport
Soekarno-Hatta International Airport () is the main airport serving the greater Jakarta area on the island of Java, Indonesia. The airport is named after the first President of Indonesia, Soekarno, and the first vice-president, Mohammad Hatta. The airport is often called Cengkareng by Indonesians. Its IATA code, CGK is originated from the locality name Cengkareng, a district located to the northwest of the city. Located about 20 km west of Jakarta, in Tangerang Regency, Banten, Soekarno-Hatta airport began to operate in 1985, replacing the former Kemayoran Airport (domestic flights) in Central Jakarta, and Halim Perdanakusuma International Airport in East Jakarta. Kemayoran Airport had since closed. Halim Perdanakusuma is still operating, serving mostly charters and military flights. Terminal 2 was opened in 1992. The land area of the airport is 18 km˛. It has two independent parallel runways separated 2,400 m connected by two cross taxiways. There are two main terminal buildings: Terminal 1 is for all domestic airlines except for flights operated by Garuda Indonesia and Merpati Nusantara Airlines, and Terminal 2 serves all international flights as well as all domestic flights by Garuda and Merpati Nusantara Airlines. Each terminal building is separated into 3 concourses. Terminal 1A, 1B, and 1C are used for (mostly) domestic flights by Indonesian airlines. Terminal 1A served flights by Lion Air, Wings Air and Indonesia AirAsia. Terminal 2D and 2E are used to serve all international flights by international airlines. Terminal 2D are for all international airlines served by PT Jasa Angkasa Semesta, one of the ground handlers in the airport. Terminal 2E are for all international airlines served by Garuda, including all international flights of Garuda Merpati. Terminal 2F are for Garuda Indonesia and Merpati Nusantara Airlines domestic flights. The airport was designed by Paul Andreu, a French architect who also designed Charles de Gaulle International Airport in Paris. One of the major characteristics of Soekarno-Hatta airport is the incorporation of the local vernacular architecture into the design, and the presence of tropical gardens in between the waiting lounges. However, due to poor maintenance, its not too strategic location, and lack of budget, the airport is inferior to many international airports in the region. However, Soekarno-Hatta International Airport was noted for its beautiful landscaping: the airport was awarded the 1995 Aga Khan Award for Architecture.[1] Soekarno-Hatta International Airport has 150 check-in counters, 30 baggage carousels and 42 gates. Each sub-terminal has 25 check-in counters, 5 baggage carrousels and 7 gates. Angkasa Pura II is currently planning to build a new terminal with modern design features. Terminal 3 is being built for low-cost airlines, and already serves hajj flights and transnational migrant laborers. There is a masterplan to make 5 passenger terminals + 1 hajj terminal and 4 runways. In 2009 the airport will be connected to Manggarai Station (future Jakarta central station) by a railway. To finance the expansion, the airport is collecting an Airport Improvement Fee of IDR 100,000 ($9 USD/8 Euro) for each international passenger and IDR 30,000 for each domestic passenger. In May 2008, ForbesTraveller.com recognized Soekarno-Hatta International Airport as the 6th most punctual airport in the world with 86.3% of its flights departing on time, while 72.3% arriving ontime.[2] Soekarno-Hatta International Airport was the 35th busiest airport in 2005/6. HistoryBetween 1928–1974, the Kemayoran Airfield intended for domestic flights was considered too close to an Indonesian military airfield, Halim Perdanakusuma. The civil airspace in the area became narrow, while air traffic increased rapidly, which risked international air traffic. In 1969, a Senior Communication Officers meeting in Bangkok expressed this concern. In the early 1970s, with the help of USAID, eight potential locations were analyzed for a new international airport, namely Kemayoran, Malaka, Babakan, Jonggol, Halim, Curug, South Tangerang and North Tangerang. Finally, the North Tangerang airspace was chosen and it was also noted that Jonggol could be used as an alternative airfield. Meanwhile the Indonesian government started to upgrade the Halim Perdanakusumah airfield to be used for domestic flights. Between 1974–1975, a Canadian consultant consortium consisting of Aviation Planning Services Ltd., ACRESS International Ltd., and Searle Wilbee Rowland (SWR), won a bid for the new airport feasibility project. The feasibility study started on 20 February 1974 with a total cost of 1 million Canadian Dollars. The one-year project proceed with an Indonesian partner represented by PT Konavi. By the end of March 1975, the study revealed a plan to build three inline runways, a perforated road, three international terminal buildings, three domestic buildings and one building for Hajj flights. Three stores for the domestic terminals would be built between 1975–1981 with a cost of US$ 465 million and one domestic terminal including an apron from 1982–1985 with a cost of US$ 126 million. A new terminal project, named the Jakarta International Airport Cengkareng (code: JIA-C), began.[3] Project Phases1975 ? 1977 To dispense the land and also set up the province border was time needed. Schipol, Amsterdam was asked for opinion which according to them is rather expensive and over design. The cost raised up high because of using decentralization system. The Centralization system was a suitable one. The Team decided on a decentralization system like the one used at Orly West Airfield, Lyon Satolas,, Langen-Hagen-Hanover and Kansas City Airport module system was adopted because it is simple and effective. 12 November 1976
18 May 1977
The result was:
20 May 1980
1 December 1980
1 December 1984
1 May 1985
Volume of PassengersThis table was based on data from the Airport Council International organization. These statistics are from the movements of passengers, freight and aircraft in CGK.[5]
TerminalsTerminal 1Terminal 1 is only for domestic flights except Garuda Indonesia and Merpati Nusantara Airlines as they operate their domestic flights in Terminal 2. This terminal has 3 sub-terminal. Each sub-terminal has 25 check-in counters, 5 baggage carousels and 7 gates. Terminal 2Terminal 2 operates international flights as well as domestic flights of Garuda Indonesia and Merpati Nusantara Airlines only. Terminal 2 has 3 sub-terminals. Each sub-terminal has 25 check-in counters, 5 baggage carousels and 7 gates. Terminal 3Terminal 3 plans to operate low-cost carriers. The terminal would be different from Terminal 1 and 2. It would also be able to operate Airbus A380. It will be finished in September-October 2008. Terminal 4Terminal 4 is opposite of Terminal 3. It is in Phase 2. Airlines and destinationsThe following airlines operate from (Jakarta) Soekarno-Hatta International Airport (as of July 2008): Passenger Terminals
Past airlines and routesThis section needs massive expansion. Past international airlines with its destinations
International airlines still in operations with its terminated routes
Terminal 3Terminal 3 is going to have 5 piers, and each pier has a capacity of 4 million.[20] After Terminal 3 is built, the capacity of Soekarno-Hatta International Airport will be 38 million passengers from currently 18 million. Terminal 3 Phase I (Pier 1) is currently under construction. When it is completed, Terminal 3 would be dedicated for low cost carriers and A380. Terminal 3 Phase I is under construction and will be finished in September-October 2008.[21] Rendering can be found here In the newest masterplan, the airport will have 2 phases of development. Phase 1 development is to build the Terminal 3 and lengthen Runway 2 to 4,000 m. Phase 2 development is to build Terminal 4 and the third runway (4,000 m). A new elevated train that will connect the airport to the city is also included in the phase 1 development [23]. Airport FacilitiesSoekarno-Hatta International provides many facilities for the passengers' convenience and during transit.[24] Some of the facilities it provides are:
Before first security check (before check in counters) the airport has many foods and beverages counters spread along the area, including A&W, McDonalds, and many more. Disabled passengers traveling though CGK have many facilities ready for them. Both terminals have toilets specially designed for the disabled and elevators. Airlines if told in advance can provide wheelchairs for disabled passengers. The airport was designed to resemble the traditional Javanese house called Rumah Joglo and it was combined with a beautifully maintained garden located in every boarding area inside the airport. LoungesThere are four first and business Lounges at the Transit Lounge in the departure area. Jasa Angkasa Semesta (JAS) Lounge, available for first and business class passengers of Cathay Pacific, Qantas, Lufthansa, Eva Air, Saudi Arabian Airlines and Singapore Airlines. Pura Indah Lounge, available for first and business class passengers of Singapore Airlines, KLM, Malaysia Airlines, Cathay Pacific and China Airlines. The new Garuda Indonesia lounge is available for GA's business class passengers only, as well as GECC cardholder. This lounge is the most comprehensive lounge facility at the airport, including meeting room, shower facilities, quiet room and many more. Beside these primary lounges, there are also other lounges that can be used as complimentary from many banks for their cardholders. Cafes can be found as well, including Starbucks. Ground TransportationInter-terminal transportationSoekarno-Hatta International Airport provides free shuttle bus which connects Terminal 1 and 2. BusCurrently a DAMRI Shuttle Bus route links CGK to Rawamangun, Blok M, Gambir Station, Bekasi, Depok, Lebak Bulus, Tanjung Priok, Kemayoran, Kampung Rambutan, Pasar Minggu, Serang, Merak, Cikarang and Bogor.[25] Nowadays Primajasa also served route Bandung-Seokarno Hatta Airport. CarDepending on traffic, Soekarno-Hatta is a 30 minutes drive from Jakarta's city center via Sedyatmo Toll Road. CGK provides parking lots however passengers should be noted that these parking lots are often over capacity.[24] Taxi and LimousineTaxis are provided and is about 30 to 45 minutes into center city Jakarta. Car rental is provided by Avis, Bluebird, Goldenbird and Europcar.[26] RailPT RaiLink, subsidiary of PT KA plans to connect Soekarno-Hatta International Airport to Manggarai Station by train service. The elevated train service construction started in March 2008 and finished in June 2009.[27] It is strongly recommended that you allow at least one hour to get to the airport from central Jakarta. If you are leaving the city after 4pm on any day, but especially a Friday, allow 90 minutes. Arriving into Jakarta from other cities you should plan to arrive after 9am so that you miss the heavy traffic. Morning commute from airport to the city can be as much as 2 to 3 hours depending on rain, inundation, incidents, roadworks or the toll operators randomly changing the payment methods or on/off ramp configurations. Furthermore, there is only one toll road servicing the airport, and as such you could miss your flight or be unavoidably delayed if not taking all these things into consideration. ProblemsThis airport has experienced many problems. In terminal 1 (domestic), the airport often exceeds its capacity. This forces passengers to stand while waiting for their departure time. Currently the airport serves over 30 million passengers per annum whereas it was only designed for 18 million passengers per annum. In both terminals, some of the restrooms are in very poor condition. The most recent problem is flooding. In recent years two cases of flooding stranded thousands of passengers at the airport. The only road to the airport got flooded so no vehicles can get through the tollway, with exceptions such as trucks and buses. Right now, there is a solution to this problem that is being researched by PT Jasa Marga Tbk.. The solution is to build a bridge over the last flood's water level so that the tollway will not be flooded again. It seems that the 'bridge' project is now a dyke project. In June 2008 Jakarta was again threatened by seasonal tidal floods. Weather forecasters were predicting the worst tidal floods in 180 years. However only minor flooding was seen and the partly completed barriers seems to have some impact on keeping the road open. At this stage (June 2008) the road seems to be some 2 metres below the top of the barrier, not very comforting at all. One wonders if the planners have decided that the 'one in a hundred years' floods, of which Jakarta has had at least 3 in the past 10 years, will not come again. Areas further inland from the airport reported flooding at least 1 metre higher than ever before and many low laying homes were flooded almost to the ceiling. Most of this internal flooding (only 5 km from the airport) seems to be the result of unchecked residential development where there has been scant regard for the impact on existing areas and certainly without any improvements to the infrastructure. PicturesImage:Sukarno hatta airport - Entrance - Jakarta - Indonesia.jpg|Main entrance Image:Sukarno hatta airport - Terminal - Jakarta - Indonesia.jpg|Terminal Image:Sukarno hatta airport - Tower - Jakarta - Indonesia.jpg |Tower Image:Airport Jakarta.JPG|Terminal building with gardens Image:check in hall.JPG|Check in desks in terminal 2 Image:terminal2cgk2.jpg|Baggage claim at terminal 2 Image:terminal2cgk.jpg|Arrival wing terminal 2 F </gallery> References
External links
de:Flughafen Jakarta fr:Aéroport international de Jakarta ko:???? ?? ???? id:Bandar Udara Internasional Soekarno-Hatta hu:Soekarno-Hatta nemzetközi repül?tér ms:Lapangan Terbang Antarabangsa Soekarno-Hatta nl:Internationale Luchthaven Soekarno-Hatta ja:??????????? pl:Port lotniczy D?akarta-Soekarno-Hatta su:Bandara Internasional Soekarno-Hatta vi:Sân bay qu?c t? Soekarno-Hatta zh:???-?????? Source: Wikipedia | The above article is available under the GNU FDL. | Edit this article
|
|
top
©2008-2009 TutorGig.com. All Rights Reserved. Privacy Statement