Search: in
BTS Skytrain
BTS Skytrain in Encyclopedia Encyclopedia
  Tutorials     Encyclopedia     Dictionary     Directory  
BTS Skytrain Email this to a friend      BTS Skytrain

BTS Skytrain

BTS Skytrain
BTS Skytrain

BTS Skytrain

The Bangkok Mass Transit System, commonly known by its abbreviation as the BTS Skytrain (), is an elevated rapid transit system in Bangkok, Thailand. It is operated by Bangkok Mass Transit System Public Company Limited (BTSC) under a concession granted by the Bangkok Metropolitan Administration (BMA). The system consists of twenty-three stations along two lines: the Sukhumvit line running northwards and eastwards, terminating at Mo Chit and On Nut respectively, and the Silom line which plies Silom and Sathon Roads, the Central Business District of Bangkok, terminating at the National Stadium and Saphan Taksin (Taksin Bridge). The lines interchange at Siam Station and have a combined route distance of 55 km. The system is formally known as the Elevated Train in Commemoration of HM the King's 6th Cycle Birthday ().

Contents


History

Skytrain approaching Sala Daeng Station
Skytrain approaching Sala Daeng Station
Interior of a train.
Interior of a train.

The MRT system was initially referred to as the Lavalin Skytrain because it was to be designed using the Vancouver SkyTrain as a model adopting the technology developed by SNC Lavalin. Due to political interference, the concession with Lavalin was cancelled in 1992, in spite of Bangkok's chronic traffic congestion. The Thai Government focused on increasing road and expressway infrastructure in an attempt to combat congestion. However, this had less than the desired impact as the number of cars on the road increased dramatically. The lines considered under the skytrain project became later the basis for the Bangkok Metro system and interesting enough are mainly underground.

In the early 1990s, foundations for the Lavalin Skytrain were constructed in the middle of two bridges spanning the Chao Phraya river. The Taksin bridge now supports the under-construction Silom line to Thon Buri, scheduled be completed by April 2009. The supports at Phra Pin-klao bridge Phra Pin-klao Bridge remain unused but may be utilised as part of the MRT's future Purple Line.

Shortly after the it became clear that the Lavalin Skytrain was stalled, then-governor Major-General Chamlong Srimuang asked his deputy Krisda Arunvongse na Ayutthaya to create a new feeder system with a route along Sukhumvit and Silom Rd. Krisda, who in the same period was elected governor, and his team from BMA managed to find an investor to build it. Krisda also convinced all to let the city supervise the project. The investor founded Bangkok Transit System Corporation and this company successfully financed the system and grew it from a feeder system to a full mass transit project. Siemens as supplier of the railway technology and the Thai contractor Italian Thai Development built the system for BTSC.

The 'Skytrain' name was given to the system later by the press. It stuck and will likely be kept even though the portion of system through the historic Rattana Kosin island will one day be below grade.

Originally, the Skytrain depot was to be built in Lumphini Park, but due to widespread objections from Bangkok residents it was constructed on a parcel of land located along Phahonyothin Road, replacing the old Northern/Northeastern bus terminal (Mo Chit). The current depot at Mo Chit is a part of the proposed 'Bangkok Terminal' project, where a large complex comprising a new regional bus terminal, park & ride facility and other commercial development can be built directly above it.

Thanayong Public Company Limited (Thai ?????? ????? ????? (?????)) had a 28.21% stake in BTSC when the Skytrain began, and therefore in its early days the system was sometimes referred to as the "Thanayong Skytrain".

The Skytrain system was officially opened on December 5 1999 by HRH Princess Maha Chakri Sirindhorn. It initially had lower-than-predicted ridership, with 200,000 passenger trips per day. Ticket revenue was only enough to meet the trains' operating cost, and not sufficient to service construction loans. However, the Skytrain's daily passenger numbers have steadily increased since then. On December 9 2005, more than 500,000 single trips were made on the Skytrain in a single day for the first time. BTSC is currently planning to purchase more trains and is studying the possibility of putting 6-car trains into service. The company will implement a contactless ticketing system in 2006, allowing both BTS and MRT passengers to use their RFID smart cards as joint tickets starting in 2007.

Station layout

Exterior view of National Stadium Station
Exterior view of National Stadium Station
The upper platform at Siam interchange station, for north- and west-bound trains
The upper platform at Siam interchange station, for north- and west-bound trains
All of the system's stations are elevated and constructed on three levels.[1] The street level provides access to the station proper via stairs and often escalators. Supporting utility equipment (generators, water tanks, etc.) are usually located at this level on traffic islands.

The first elevated level of the stations contains the ticket booths, some small kiosk-like shops and access control gates. The second level (and third at Siam station) is again accessed with stairs and escalators and contains the platforms and rails. With the exception of Siam Station, the stations follow a side platform layout. Siam Station utilizes island platforms to facilitate cross-platform transfer between the two lines. Additionally, many stations have ramps and elevators to allow wheelchair-bound passengers to access the ticketing hall and platforms from the street. The distances between doors are equal throughout the train, regardless of whether they are in the same or different cars, and the locations where the doors will be after the train has stopped are marked on the platform. The platforms are built to accommodate trains of six cars, but trains of only three cars are in operation. For security and safety, security personnel are stationed at every platform and all ticketing halls.

Three Skytrain stations, Sala Daeng, Asok and Mo Chit, are interchanges with the underground MRT system. Saphan Taksin station is connected to the adjacent Sathon pier where the Chao Phraya Express Boat services call. Many stations are linked by 'Skybridges' (overhead pedestrian walkways) to neighbouring buildings and public amenities.

Consumption of food or drinks is forbidden past the ticketing gate or on the Skytrain.

Ticketing

For single-trip and stored-value ticket holders fares are calculated according to distance, but adult / student / tourist passes for limited / unlimited train rides are also available. Next to the magnetic fare cards, which require replacement once every two years, the Skytrain has adopted near-field contactless technology in its ticketing system, with the intent of becoming compatible with the system presently used in the MRT.

Stations

In the table below, an italicized name indicates that the station is a planned extension to the current line and not yet in operation.

Code Station Name Notes coordinates
Sukhumvit Line
N20 Saphan Mai (2010-2012)
N19 Sai Yut (Phahonyothin 57) (2010-2012)
N18 Lak Si Monument (Phahonyothin 50) (2010-2012)
N17 Wat Prasri Mathadhat (2010-2012)
N16 the 11th Infantry Regiment (2010-2012)
N15 Bang Bua (2010-2012)
N14 Royal Forestry Department (2010-2012)
N13 Kasetsart University (2010-2012)
N12 Sena Nikhom (2010-2012)
N11 Ratchayothin (2010-2012)
N10 Phahonyothin 24 (Satree Warranat) (2010-2012)
N9 Lat Phrao Intersection (2010-2012)
Vibhavadee (Planned, 2010-2012)
N8 Mo Chit MRT Blue Line: Chatuchak Park Station
Terminal station
N7 Saphan Khwai
N6 Sena Ruam (Planned)
N5 Ari
N4 Sanam Pao
N3 Victory Monument BMTA bus lines
N2 Phaya Thai Skytrain StationPhaya Thai Suvarnabhumi Airport Link: Phaya Thai Station (2009)
N1 Ratchathewi
CS Siam Interchange to Silom Line
Tourist information office
E1 Chit Lom
E2 Phloen Chit
E3 Nana Tourist information office
E4 Asok MRT Blue Line: Sukhumvit Station
E5 Phrom Phong
E6 Thong Lo
E7 Ekkamai Eastern Bus Terminal
E8 Phra Khanong
E9 On Nut Terminal station
E10 Bangchak (End of 2010)
E11 Punnawithi (End of 2010)
E12 Udom Suk (End of 2010)
E13 Bang Na (End of 2010)
E14 Bearing (End of 2010)
E15 Samrong (further extension to Samut Prakan Province)
Silom Line
W6 Prannok (planned ?) MRT Blue Line (future extension)
W5 Bangkok Noi (planned ?)
W4 Sanam Luang (planned ?)
W3 Phanfa Lilat (planned ?) MRT Purple Line (future extension)
W2 Kasat Sueg (planned ?)
W1 National Stadium Terminal station
CS Siam Interchange to Sukhumvit Line
S1 Ratchadamri
S2 Sala Daeng MRT Blue Line: Si Lom Station
S3 Chong Nonsi BRT: Chong Nonsi Skytrain Station (planned)
S4 Sueksa Witthaya (Planned)
S5 Surasak
S6 Saphan Taksin Chao Phraya Express Boat (Sathon Central Pier)
Tourist information office
Terminal station
S7 Krung Thonburi (April 2009)
S8 Wongwian Yai (April 2009) MRT Purple Line (future extension)
S9 Po Nimit (2011?)
S10 South Ratchadaphisek (2011?)
S11 Wutthakat (2011?)
S12 Bang Wa (2011?) MRT Blue Line (future extension)
S13 Wat Pra Du (2011?)

Route extension

No Skytrain extensions have opened since the opening of the original system. There are many political problems in Thailand with favoritism and nepotism regarding the contracts for expansions from the government, until recently controlled by Prime Minister Thaksin Shinawatra's Thai Rak Thai party, of stalling the Skytrain extensions in order to punish the BMA, which is controlled by the opposition Democrat Party, by doing so hoping to prevent the Democrats from gaining popularity among Bangkok residents.

In 2002 the cabinet was requested to amend a law in order to allow a private firm to finance the cost of operating the train system, while the government takes care of all the civil engineering works. On October 18, 2005, with no approval from the central government forthcoming, the BMA decided to seek to complete the 2.2 km Silom Line route extension (S7 Charoen Nakhon & S8 Wongwian Yai) using its own budget. Construction began on December 13, 2005 with completion originally expected within a year, but problems with tendering for the signalling system have repeatedly pushed back the schedule, with the opening now planned for early 2009, first scheduled to open September 2002.

The extension plan for the BTS can be summarized as follows:

Phase I

  • On Nut – Samrong (terminating at Sukhumvit Soi 119) – 8.9 km, Now, shortened to Onnut - Bearing (terminating at Sukhumvit 107, the border pole of BMA) – 5.2 km. The rest has been pushed to Phase II
  • Saphan Taksin – Wong Wian Yai (terminating at Th. Somdet Chao Phraya) – 2.2 km
  • Mo Chit – Saphan Mai – 12 km

Phase II

  • Samrong – Samut Prakan – 7.9 km (Now Bearing - Samrong - Samut Prakarn - with total distance of 10.6 km)
  • Wong Wian Yai – Bang Wa (terminating at Th. Phetchakasem) – 4.5 km
  • National Stadium – Phran Nok (terminating at Th. Charan Sanit Wong) – 6.8 km

It is estimated that most of the extension plans above will be completed by 2010 or 2012 at the latest, though political bickering has got in the way in the past.

See also

References

External links

de:Bangkok Skytrain es:Metro Aéreo de Bangkok fr:Métro aérien de Bangkok nl:Bangkok Skytrain ja:???????????? fi:Skytrain (Bangkok) th:?????????????????????? 6 ?????????????? vi:H? th?ng tàu ?i?n trên cao Bangkok zh-yue:??BTS zh:????????


BTS Skytrain
BTS Skytrain
BTS Skytrain

Source: Wikipedia | The above article is available under the GNU FDL. | Edit this article

BTS Skytrain
BTS Skytrain
Search for BTS Skytrain in Tutorials
Search for BTS Skytrain in Encyclopedia
Search for BTS Skytrain in Dictionary
Search for BTS Skytrain in Open Directory
Search for BTS Skytrain in Store
Search for BTS Skytrain in PriceGig


Help build the largest human-edited directory on the web.
Submit a Site - Open Directory Project - Become an Editor

BTS Skytrain
Advertisement

Advertisement



BTS Skytrain in Encyclopedia
BTS Skytrain top BTS Skytrain

Home - Add TutorGig to Your Site - Disclaimer

©2008-2009 TutorGig.com. All Rights Reserved. Privacy Statement